Area of Concentration: Process Engineering

 

Research Line - Industrial Processes

 

Application of the GMAW / FCAW Process with the addition of Cold Wire in Cavitation Failure Repairs in Hydraulic Turbines

Coordinator: Eduardo De Magalhães Braga

Start date: 01/2010

Funding: CNPq

 

Operational Evaluation of Different Strategies for Interconnecting Photovoltaic Panels to the Electric Grid

Coordinator: Wilson Negrão Macedo

Start date: 01/2013

Funding: CNPq

 

Technology Development in Mineral Transport

Coordinator: Eduardo De Magalhães Braga

Start date: 01/2012

Funding:

 

Development of a Fuzzy Type Controller Applied in Photovoltaic Pumping Systems Coupled to Conventional Frequency Converters

Coordinator: Wilson Negrão Macedo

Start date: 01/2013

Funding: CNPq

 

Flows in Porous Media

Coordinator: Emanuel Negrão Macedo

Start date: 01/2010

 

Studies of Geological and Process Parameters to Enable Technical-Scientific Solutions, Demanded by the Production Chain of Mining, Metallurgy and Materials of the State of Pará

Coordinator: Eduardo De Magalhães Braga

Start date: 01/2011

Funding: FAPESP

 

Experiments and Simulation in Non-Newtonian Flows

Coordinator: João Nazareno Nonato Quaresma

Start date: 01/2005

Funding: CNPq

 

Modeling, Simulation and Estimation of Thermophysical Properties in the Combustion of Solid Waste (Wood)

Coordinator: Emanuel Negrão Macedo

Start date: 01/2002

Funding: CNPq

 

The Use of Residues from the Bayer Process (Red Mud) in the Washing of Gaseous Effluents from Burning Fossil Fuels

Coordinator: Emanuel Negrão Macedo

Start date: 01/2005

Funding: CNPq

 

Production of Cachaça in the Abaetetuba Islands Region: Basic Notions of Engineering

Coordinator: Emanuel Negrão Macedo

Start date: 01/2012

Funding: CNPq

 

Prediction of Failures in Industrial Processes - PredFalt

Coordinator: Petrônio Vieira Júnior

Start date: 01/2011

Funding: UFPA

 

Production of Zeolites for Absorption of Natural Gas

Coordinator: João Nazareno Nonato Quaresma

Start date: 01/2008

Funding: CNPq

 

Recovery of Titanium from Red Mud by Leaching

Coordinator: Emanuel Negrão Macedo

Start date: 01/2009

Funding: CNPq

 

Recycling of Coal Waste as a Raw Material for the Construction Industry

Coordinator: Celio Augusto Gomes de Souza

Start date: 01/2008

Funding: CNPq

 

Pilot Digital Speed ​​Regulator, with Adaptation Capacity and Integrated to the Digital Supervision and Control System

Coordinator: Carlos Tavares da Costa Junior

Start date: 01/2008

Funding: ELETRONORTE

 

Sintering in a Vertical Fixed Bed Reactor: Development of a Process for Synthetic Aggregate Production from Waste from the Bayer Process (Red Mud) and Biomass

Coordinator: Emanuel Negrão Macedo

Start date: 01/2012

Funding: CNPq

 

Hydrokinetic Hydraulic Turbines to Use the Remaining Potential in Hydroelectric Plants

Coordinator: Andre Luiz Amarante Mesquita

Start date: 01/2012

Funding: ELETRONORTE

 

Valuation and Environmental Impact Assessment of Waste from Mining-Industrial Installations

Coordinator: Emanuel Negrão Macedo

Start date: 01/2009

Funding: CNPq

 

Research Line - Process Control and Automation

 

Application of the Robotic Fcaw Process with the addition of cold wire in shipbuilding

Coordinator: Eduardo de Magalhães Braga

Start date: 01/2011

Funding: CNPq

 

Development of Systems for Intelligent Monitoring and Control of Electric Power Systems

Coordinator: Walter Barra Junior

Start date: 01/2009

Funding: CNPq